Confronted with the Battery power running out after 8 hours of pumping coolant around a nuclear reactor ; and having new diesell generators made available within 4 hours (BUT: with the wrong plug/sockets fitted)

1 vote
Would you wait for the Sea Water Tsunami Flooded standby Generators to dry out and hope that they work sometime soon?
 
100% / 1 vote
Would you observe the strict Electrical code and allow the Batteries to do their job for the next 4 hours and cross fingers?
 
0% / 0 votes
Would you apply for the Engineering Approval design to enable the connection of the Generator flown in with the wrong plug/socket combination to be designed and passed through standard channels?
 
0% / 0 votes
Would you "Jury Rig" the generators to continue powering the Coolant Pumps?
 
0% / 0 votes


Click here to share poll on specific pages, user profiles or purchase votes!